SCOPE OF A TYPICAL STRUCTURED CABLING ENGAGEMENT
01Certified Cat6 / Cat6A installation and testing
02Single-mode and OM4 fiber backbones
03Rack, ladder-rack, and IDF/MDF buildouts
04Labeled, tested, documented — every run
05New-construction pre-wire coordination
Anyone can pullstapleburypull a cable.Certified, labelled and tested at both ends is what makes the next three system refreshes cheap. Nothing behind a closed ceiling gets fixed for a reasonable number.
Built to be serviced.A cable plant the next technician can read without calling you.
The mechanism, not the brochureThree things worth understanding before you buy them. Each diagram runs on its own once it scrolls into view.
ROUTING · 6 RUNS
PathwayTRAY · SLEEVES
Firestop at rated walls✓
Labelled both ends✓
ILLUSTRATIVE
CERTIFIED · 6 / 6 PASS
Wire mapPASS
Insertion lossPASS
NEXT margin+4.1 dB
REPORT SAVED
ILLUSTRATIVE
IN THE CEILING

The work nobody sees, tested anyway

Certification, power and pathways, shown the way we check them on site.

01

Link certification

Every link is tested for wiring, length and signal quality. You get certification reports, as-builts and a port map.

02

PoE budget

A port class is not a budget. Draw is summed per device type — a PTZ with a heater is four domes — against one shared supply, with headroom for next year.

03

Pathway, firestop and labels

Routes are planned before pulling cable. Rated penetrations are firestopped, and every port gets a clear label.

04

Fiber backbone testing

Every fiber link is traced end to end. Splices and connectors show up as events with measured loss, saved with the as-builts.

Inside a cabling job

Structured Cabling installation by ShieldTech in the Lehigh Valley
01

Cat6 and Cat6A

Horizontal runs to every camera, reader, AP and desk, labeled at both ends and tested to the standard.

02

Fiber backbone

Single- and multi-mode fiber between closets and buildings, terminated, tested and documented.

03

Patch panels and racks

Dressed, labeled panels in properly grounded racks with room to grow.

04

IDF and MDF buildouts

Closet layout, ladder rack, power and cooling considered before the first cable is pulled.

05

Test reports

Certification results for every run handed over with the as-built drawings.

Scope of a typical structured cabling engagement

  • Certified Cat6 / Cat6A installation and testing
  • Single-mode and OM4 fiber backbones
  • Rack, ladder-rack, and IDF/MDF buildouts
  • Labeled, tested, documented — every run
  • New-construction pre-wire coordination
  • Cable-plant cleanup and remediation
IN DEPTH
A cable plant that outlives the equipment on it
01 / 02

A cable plant that outlives the equipment on it

Cabling is the longest-lived part of any system in the building, and the cheapest thing to get right at the start. We design horizontal runs, pathways, and telecom rooms to industry standard: Cat6 or Cat6A where the application and the run length call for it, single or multimode fiber between buildings and between floors, correct bend radius and support spacing, and separation from electrical sources. Cameras, access control, wireless and phones all ride the same plant, so it is sized for the load in five years rather than the load at cutover.

Racks, enclosures and terminations are built to be worked in. Labeling follows a scheme that a stranger can read, patch panels are laid out to match the room, and cable management is installed rather than improvised. This is the difference between a service call that takes twenty minutes and one that takes an afternoon.

Testing, certification and documentation
02 / 02

Testing, certification and documentation

Every link is tested and certified to standard, and you get the results. Certification reports, as-built drawings, a port-to-location map and labeling documentation are part of the deliverable, not an extra. The next contractor into the building — including us, three years later — should be able to work from the paperwork.

In occupied buildings and active plants, the schedule is the constraint. Runs in conduit, above hard ceilings, through masonry or across production areas are planned around shifts and access windows, with core drilling and fire-stopping done properly. In new construction and fit-outs we coordinate with the electrical and mechanical trades so pathways exist when we need them.

Cable and connectivity we specify

Structured Cabling platforms installed by ShieldTech

Panduit

PATHWAYS & RACKS

Racks, ladder rack, and cable management — the bones of an IDF that still looks right ten years in.

Leviton

CONNECTIVITY

Jacks, patch panels, and enclosures with lifetime system warranties when installed to the manufacturer's requirements.

CommScope

STRUCTURED PLANT

Cat6A and fiber systems for enterprise backbones — the spec-grade choice on engineered projects.

Belden

CABLE

Copper and fiber cable trusted in industrial and broadcast environments — what we pull when failure isn’t an option.

Corning

FIBER OPTICS

Single-mode and OM4 fiber, splice enclosures, and connectivity — the backbone standard.

Fluke Networks

CERTIFICATION

Every run tested and certified on Fluke Versiv — you get the reports, not our word for it.

WHY SHIELDTECH

Structured Cabling, done the long-term way

What to confirm for structured cabling work across Allentown, Bethlehem, Easton, Reading and the wider Lehigh Valley.

SHIELDTECH
ASK ANY BIDDER
Site survey
On-site walkthrough and a marked-up floor plan before pricing
Will you survey on site?
Platform choice
Platform-agnostic: the line that fits your building, bandwidth and budget
Why this platform?
Existing equipment
Tested, and kept where it passes
What can be reused?
Handover
As-builts, labels, accounts and staff training
Which records do we get?
After install
Local Lehigh Valley team for service and maintenance
Who provides local support?

Planning a cabling project

Cabling cost is mostly labor and pathways. The survey decides routes, closets and testing before a single drop is priced.

WHAT DRIVES THE COST

What sets the scope

  • Number of drops and their distance from each closet
  • Pathways: open ceilings, hard lids, conduit, core drilling, plenum spaces
  • Copper category and fiber type for backbone runs
  • Closet build-out: racks, patch panels, cable management, grounding
  • Phasing around occupied spaces and working hours
  • Labeling and certification testing requirements
EXISTING SYSTEMS

Existing cabling

Existing cable can sometimes stay in service if it tests to the required standard. We test or sample existing runs during the survey and quote replacement only where the cable or its pathway will not support the planned equipment.

THE SITE SURVEY CHECKS

Before anything is priced

  • Closet locations, space, power and cooling
  • Ceiling and wall conditions along each route
  • Existing cable condition and labeling
  • Devices each drop will serve: desks, cameras, access points, doors
AT HANDOVER YOU GET

Cable you can trace

  • Every run labeled at both ends
  • Certification test results for each drop
  • Rack elevations and patch documentation
  • As-built drawings of routes and closets
Book a cabling walkthrough We walk the routes and closets, then send a drop-by-drop proposal. Or call +1 484-800-1220.

How a cabling job runs

Every camera, reader and access point is only as reliable as the cable behind it. We plan the pathways, pull and terminate, certify every run and hand over the documentation.

  1. STEP 01

    Plan pathways

    Routes, tray, penetrations and closet locations on the drawings.

  2. STEP 02

    Pull and terminate

    Cat6, Cat6A or fiber to every device and desk, dressed into managers.

  3. STEP 03

    Certify

    Every run tested; failures fixed before handover.

  4. STEP 04

    Document

    Labels at both ends, test reports and as-built drawings.

Cabling questions

Structured Cabling questions answered
Cat6 or Cat6A?

It depends on the application and the run. We specify per link rather than per building, and tell you where the extra cost buys headroom and where it does not.

Do we get test results?

Yes. Every link is tested and certified, and the reports, as-builts, labeling scheme and port map are handed over as part of the job. When comparing structured cabling quotes, ask for the cable category or fiber type, drop count, testing requirements and labeling scope in writing. At handover, match each test report to the labels at both ends and the port map so your IT team can trace a connection later.

Can cabling be installed in an occupied building?

Yes. Most of our work is. Runs are planned around shifts and access windows, with proper fire-stopping and core drilling.

Can you run fiber between our buildings?

Yes. Single and multimode fiber, indoor and outdoor rated, terminated and tested, with the pathway engineered for the route.

RELATED SERVICESOften installed together
FREE ON-SITE WALKTHROUGH

Tell us about the building. We will call you back within one business day.

A short walkthrough, then a line-item proposal. No packages, no pressure. Local crews across the Lehigh Valley, Berks, Bucks, Montgomery, Philadelphia and NJ.

Or call +1 484-800-1220
Sent securely to ShieldTech. We reply by phone or email, usually the same business day.
RELATED READING

Not sure what the building needs? We walk the routes.

We’ll assess your building, your network, and your budget — then recommend the platform we’d put in our own facility, with line-item pricing.